... for a .75/contract credit.
Notes: Another small, COVID-19 weakness-related underlying, with a cost basis of 1.25/share if assigned.
Notes: Another small, COVID-19 weakness-related underlying, with a cost basis of 1.25/share if assigned.
עסקה פעילה
Late post: Rolled the September 2 out to Dec for an additional .22 credit before the train (potentially) leaves the station. Total credits collected of .97; cost basis of 1.03 if assigned on the 2 (94.2% ROC at max in a cash secured environment).עסקה פעילה
Post earnings (if you can call them that), rolling the 2 up a strike to the 3 for a a realized gain and a .43/contract credit. Total credits collected of 1.40/contract.העסקה בוטלה באופן ידני
Out here for 1.07. Scratch at 1.40 - 1.07 = .33 ($33)/contract winner. Basically, cleaning up the margin account a bit, so that it's not so "busy." :-)כתב ויתור
המידע והפרסומים אינם אמורים להיות, ואינם מהווים, עצות פיננסיות, השקעות, מסחר או סוגים אחרים של עצות או המלצות שסופקו או מאושרים על ידי TradingView. קרא עוד בתנאים וההגבלות.
כתב ויתור
המידע והפרסומים אינם אמורים להיות, ואינם מהווים, עצות פיננסיות, השקעות, מסחר או סוגים אחרים של עצות או המלצות שסופקו או מאושרים על ידי TradingView. קרא עוד בתנאים וההגבלות.
